|
Documents | Photos | Features | Classroom | Links | Listserv | About Us | Search |
Photo Gallery |
|
[ New Search ]
First Batch of Concrete at Norris Dam Site
Location : TN
Description :
Getting ready for the mixer to pour the first batch of concrete at Norris Dam site. This
concrete was used for the foundations of the temporary heavy-duty bridge over the Clinch River
just below the Dam. Taken 11-1-33. Listed Under:
|